Explore CHANCE Series 90, Thern Liberty and Harken HighTailer through original manufacturer illustrations, model-specific mounting and rope-routing guidance, load-path scenarios, inspection logs and practical-evaluation worksheets. Online awareness supports—but does not replace—equipment-specific hands-on training and employer authorization.
LanguagesEnglish and Spanish available · Russian in preparation
CompletionAwareness completion record
Before the line moves
Plan the whole system.
A capstan hoist is only one component of a material-handling system. The load, mounting, rope, rigging, power source, route, communication, and people in the area must be controlled together.
This course explains the awareness principles behind a safe plan. It does not replace the owner’s manual, a hands-on practical evaluation, employer authorization, or a task-specific lift plan.
Learning outcomes
Recognize what must be verified.
1
Plan the full route
Identify the actual load, limiting component, mounting, path, and responsible roles.
2
Inspect before use
Recognize conditions that require removal from service and controlled follow-up.
3
Control the movement
Keep people clear, test deliberately, and stop when communication or conditions change.
4
Document practical readiness
Use the field sheet with an employer-designated qualified or competent evaluator.
Planning tools
Construction Plan Studio
Use the calculator to organize the route, load information, roles, and planning notes before the employer-approved work plan is finalized.
Independent awareness content based on supplied equipment documents and OSHA resources. Original excerpts identify their source; they do not imply manufacturer endorsement. The employer determines the requirements for the actual equipment, worksite and jurisdiction.
01 · hubbellcdn.com
CHANCE® Series 90 Capstan Hoist Owner's Manual (TD09193E)